Interconnected with the National Railway! Jingye Railway dedicated line opened

2025-09-18
Interconnected with the National Railway! Jingye Railway dedicated line opened

On August 17, the Jingye Railway dedicated line, with train GT31108 (pictured), began operating on the National Railway, marking the successful integration of the Jingye Railway with the National Railway. The 23-kilometer Jingye Railway line utilizes zero-emission electrified technology throughout. It has three stations: its starting point connects to Xibaipo Station on the Shuohuang Railway, where it establishes the Xibaipo interchange yard, and the Dawu Rang Station, before ending at Jingye Station. Jingye Station is a terminal freight station. From west to east, it houses an unloading area, a delivery area, and a finished steel loading area, serving a total of 15 lines. Jingye Station on the Jingye Railway line now has national rail shipping capacity. Based on the dedicated line's annual steel shipment capacity of 1.83 million tons, this line can increase the proportion of clean transportation by 2.82%, reduce automobile travel by 53,800 trips per year, and alleviate transportation pressure within the county.